NSE:JPPOWER   JAIPRAKASH POWER
Power Plant Operations
A) 400 MW Vishnuprayag Hydro-Electric Plant in the State of Uttarakhand, which is in operation since October 2006.
B) 500 MW Jaypee Bina Thermal Power Plant in Distt. Sagar (M.P.) consists of two units of 250 MW each, First unit had been in operation since August 2012, and the second unit since April 2013.
C) 1320 MW Jaypee Nigrie Supercritical Thermal Power Plant (JNSTPP) in Distt. Singrauli (M.P.) consists of two units of 660 MW each, First unit had been in operation since September 2014, and the second unit since February 2015.